A transit signal priority system in Eastleigh, England reduced bus delay by 9 seconds/vehicle/intersection and increased delay for other traffic by 2.2 seconds/vehicle/intersection.
Date Posted
12/13/2005
Identifier
2007-B00376
TwitterLinkedInFacebook

Monitoring and evaluation of a public transport priority scheme in Eastleigh

Summary Information

This project evaluated the impacts of a transit signal priority system in Eastleigh, England. The system consisted of 25 buses equipped with electronic transponder tags designed to communicate with in-pavement loop detectors installed on eight links at four congested intersections. When a bus was detected approaching an intersection, signal priority control software was activated at the signal controller. A new green phase or green phase extension was granted depending on a pre-defined set of signal control parameters that gave buses high priority over other traffic.

The systems were installed at the following four intersections.

  • Leigh Road/Woodside Avenue / Passfield Avenue (controlled by Split Cycle Offset Optimization Techniques (SCOOT) software).
  • Leigh Road/Romsey Road (controlled by SCOOT software).
  • Romsey Road/Upper market Street (controlled by SCOOT software).
  • Leigh Road/Bournemouth Road (controlled using vehicle-actuation).


At the SCOOT controlled intersections, field data were collected for one week with the system "on" and one week with the system "off." At the Vehicle-Actuated controlled intersection, data were collected for three days with the system "on" and three days with the system "off." Data were collected between 7:30am and 6:00pm each day.

The study area was saturated and transit volumes were maintained at about 4 to 5 vehicle per hour. Roadside and on-bus surveyors measured bus journey times by recording the time of day a bus passed an intersection detector or stop line. Bus journey times “with” and “without” the system activated were used to evaluate system impacts on bus speeds, traffic delays, and system operations. Impacts on bus emission levels and fuel consumption were calculated using speed-related emissions factors derived from a national emissions database. Impacts on other traffic were assessed using general traffic data collected from loop detectors at each SCOOT intersection.

RESULTS

The relatively high priority given to buses improved bus performance and reduced bus delay; however, because such a high level of priority was granted, additional delays were incurred by other vehicles.

 

IMPACTS OF
TRANSIT SIGNAL PRIORITY (TSP)
Buses
Other Traffic

Delay (sec/veh/junction)
-9 seconds
2.2 seconds

 


(Data excerpted from: TRL 411, Table 16 - Summary of Impacts)

 

Goal Areas
Deployment Locations