Lesson

Consider implementing interim traffic management systems (ITMS) for long-term construction projects.

Lessons Learned in the Palm Beach ITMS Deployment and Operation


July 31, 2011


Background (Show)

Lesson Learned

The evaluation of the Palm Beach County (PBC) Interim Traffic Management System (ITMS) project include: documenting the successful innovations deployed and proven in the project, documenting the institutional integration among the stakeholders, particularly in terms of both routine and emergency operations (mainly incident management), documenting the lessons learned, particularly the pitfalls that others should avoid in applying an Interim Traffic Management System solution, and to offer ideas for improving ITMS deployments in the future. Some of the lessons learned during the implementation and operation of the ITMS include the following:
  • Avoid failures and disruptions in operations by training operators to deal quickly and decisively with unexpected system failures. This training should include having a plan in place to deal with the unexpected.
  • Prepare an interim traffic management device backup plan for temporary power supply during commercial power outages. If portable generators are used to supply power make sure they are secured in place to avoid theft.
  • Anticipate location design needs for interim traffic management devices including stabilization pads on slopes, wind bracing, and rain shields.
  • Consider the climate where units are deployed, compared with where units are produced. (e.g., battery maintenance in hot climates may differ from maintenance in cooler climates.)
  • Provide for spare parts to be readily available for system maintenance.
  • Find inexpensive software and hardware solutions where possible (e.g., timers on controllers needing to be reset manually versus remotely).
  • Assess needs for solar power solutions (e.g., be aware of the exposure of solar panels to the sun's direct path).
  • Balance the need for displaying messages on portable devices with power availability.
  • Plan for component replacement for projects of long duration.
  • Initiate public outreach before the ITMS is operational and continue aggressively throughout the deployment to ensure the public understands the purpose of the systems.
The Palm Beach ITMS was highly successful in allowing FDOT to provide much needed traveler information during the critical reconstruction of I-95, without waiting several years for the completion of fixed signs and instruments. As a temporary project, initial expectations of the ITMS were not all that high however expectations were met and exceeded. The portable units clearly demonstrated their effectiveness and many lessons were learned through the project. The success of this ITMS system should be reviewed by those considering options for traffic management for long duration construction projects.


Lesson Comments

No comments posted to date

Comment on this Lesson

To comment on this lesson, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

Palm Beach County Interim Traffic Management System (ITMS): Lessons Learned in the ITMS Deployment and Operation, Final Evaluation Report

Author: Televent Transportation - North America

Source Date: July 31, 2011

Lesson Contacts

Lesson Analyst:

Dawn Hardesty
Noblis
(202)-863-3648
Dawn.Hardesty@noblis.org


Rating

Average User Rating

0 ( ratings)

Rate this Lesson

(click stars to rate)


Lesson ID: 2013-00644