Skip to Content Skip to Search U.S. Department of Transportation (US DOT) Logo Research and Innovative Technology Administration (RITA) Logo Intelligent Transportation Systems Research and Innovative Technology Administration (RITA)
 

 

Need assistance? Contact us or view the Help page.
Quick Links: Applications Overview icon Benefits Database icon Costs Database icon Deployment Statistics icon Lessons Learned icon
in   Search Help

 

Systems Engineering Graphic for Subsystem VerificationSubsystem Verification (13 unique lessons found)

To view:

  • Single Lesson - Select a lesson title link
  • Multiple Lessons - Select the lesson checkboxes and then select a View Selected Lessons button
  • In addition to the lessons learned listed below, use the Search option at the top of this page to find lessons on a particular topic by using keywords of your choice.
  • Related Resources

Adhere to the proposed standard evaluation approach in order to facilitate high response rates and to collect reliable data on 511 implementation.
Experience from Implementing a Standard Evaluation Approach and Measures as Part of the Arizona 511 Model Deployment.

Expect to spend time and effort in testing and refining the voice recognition features of a 511 system.
An Arizona Department of Transportation experience in 511 implementation.

Optimize travel time messaging operations by improving the way in which data is collected, analyzed, and displayed.
Four American Cities' experiences with Travel Time Messaging on Dynamic Message Signs.

Include significant planning and development time in the overall project schedule to accommodate identifying and addressing the various compatibility issues, to integrate existing legacy system equipment across multiple agencies.
Orlando, Florida's experience with a Field Operational Test (FOT) on using a single smart card for transportation payments at facilities operated by multiple regional agencies.

Develop a thorough installation and implementation process as part of the ITS deployment.
Five rural transit agencies' experiences in applying ITS to rural transit.

Recognize the data requirements of an Advanced Public Transportation System (APTS).
Experience from the Cape Cod Advanced Public Transit System.

Expect that new technology will require modifications before it is useable.
A Washington State experience with testing of electronic container door seals (E-seal) through a freight supply chain.


Related Resources:

Integration and Verification Systems Engineering for Intelligent Transportation Systems, January 2007
http://ops.fhwa.dot.gov/publications/seitsguide/section4.htm#s4.7
Cost: Free

Chapter 9: Integration & Test Phase - Systems Development Life Cycle Guidance Document, Department of Justice, January 2003
http://www.usdoj.gov/jmd/irm/lifecycle/ch9.htm
Cost: Free

System Test Plan Template – Appendix J, Florida's Statewide Systems Engineering Management Plan, Version 2, Florida Department of Transportation, March 2005
http://www.floridaits.com/SEMP/Files/PDF_Report/ApxJ.pdf
Cost: Free

Test Procedures Template – Appendix K, Florida's Statewide Systems Engineering Management Plan, Version 2, Florida Department of Transportation, March 2005
http://www.floridaits.com/SEMP/Files/PDF_Report/ApxK.pdf
Cost: Free

System Test Report Template – Appendix L, Florida's Statewide Systems Engineering Management Plan, Version 2, Florida Department of Transportation, March 2005
http://www.floridaits.com/SEMP/Files/PDF_Report/ApxL.pdf
Cost: Free

Security Engineering Plan Template – Appendix S, Florida's Statewide Systems Engineering Management Plan, Version 2, Florida Department of Transportation, March 2005
http://www.floridaits.com/SEMP/Files/PDF_Report/ApxS.pdf
Cost: Free

Verification: Sub-system and System Level Verification
Systems Engineering Guidebook for ITS, California Department of Transportation Division of Research and Innovation, January 2007
http://www.fhwa.dot.gov/cadiv/segb/views/document/Sections/Section3/3_6_3.htm
Cost: Free

top