Skip to Content Skip to Search U.S. Department of Transportation (US DOT) Logo Research and Innovative Technology Administration (RITA) Logo Intelligent Transportation Systems Research and Innovative Technology Administration (RITA)
 

 

Need assistance? Contact us or view the Help page.
Quick Links: Applications Overview icon Benefits Database icon Costs Database icon Deployment Statistics icon Lessons Learned icon
in   Search Help

 

Systems Engineering Graphic for System Verification & DeploymentSystem Verification & Deployment (21 unique lessons found)

To view:

  • Single Lesson - Select a lesson title link
  • Multiple Lessons - Select the lesson checkboxes and then select a View Selected Lessons button
  • In addition to the lessons learned listed below, use the Search option at the top of this page to find lessons on a particular topic by using keywords of your choice.
  • Related Resources

Employ sensors that can account for a range of parking lot vehicle movements.
Experience from the smart parking field test at the Rockridge, Oakland BART station.

Exercise careful planning in preparation for issuing an RFP to help mitigate cost, schedule, and performance risks.
The Riverside Transit Agency experience with the methods of award and terms and conditions used to procure equipment and software for automatic vehicle location (AVL) and computer-aided dispatch (CAD).

Perform System Monitoring of 511 Systems.
A national experience with the development and deployment of 511 Systems.

Test new signal timing plans, even on a shoestring budget.
Experience from a synthesis of signal timing projects.

Conduct a site survey when developing a new signal timing plan.
Experience from a synthesis of signal timing projects.

Optimize travel time messaging operations by improving the way in which data is collected, analyzed, and displayed.
Four American Cities' experiences with Travel Time Messaging on Dynamic Message Signs.

Provide drivers with sufficient managed lane information that can be easily disseminated and understood.
A guidance provided by the Texas Transportation Institute on providing user information in managed lanes facilities.

Develop a thorough installation and implementation process as part of the ITS deployment.
Five rural transit agencies' experiences in applying ITS to rural transit.

Recognize the data requirements of an Advanced Public Transportation System (APTS).
Experience from the Cape Cod Advanced Public Transit System.

Expect that new technology will require modifications before it is useable.
A Washington State experience with testing of electronic container door seals (E-seal) through a freight supply chain.

Use an appropriate procurement mechanism to support the implementation of multiple advanced traveler information technologies.
Institutional lessons from a partnership to implement emerging ITS technologies in the Seattle metropolitan area.

Use tested and effective traffic management systems for Transportation Management Centers (TMCs).
Eight states' experiences with ITS Traffic Management Systems for TMCs.


Related Resources:

Initial Deployment Systems Engineering for Intelligent Transportation Systems, January 2007
http://ops.fhwa.dot.gov/publications/seitsguide/section4.htm#s4.8
Cost: Free

Verification: Sub-system and System Level Verification
Systems Engineering Guidebook for ITS, California Department of Transportation Division of Research and Innovation, January 2007
http://www.fhwa.dot.gov/cadiv/segb/views/document/Sections/Section3/3_6_3.htm
Cost: Free

Chapter 10: Implementation Phase - Systems Development Life Cycle Guidance Document, Department of Justice, January 2003
http://www.usdoj.gov/jmd/irm/lifecycle/ch10.htm
Cost: Free

top