Unit Cost Entry

Unit Cost Element - Conduit Design and Installation - Corridor

Unit Cost Component - Conduit Design and Installation - Corridor


Portland, Oregon, USA


Description

PVC Conduit

Cost Type

Actual

Data Date

2003

Reported Units



Units

Per Mile

Year (Dollars)

2003

Capital Cost per Unit ($)

$64,000.00

O & M Cost per Unit ($)



Lifetime

30 years


Notes

Source

ITS Integration Program Unit Cost Data Collection Sheet: Oregon ITS Integration - Portland, OR (FY00)

Author: Annette Clothier


Unit Cost Details

Capital Cost per Unit: $64,000.00

O&M Cost per Unit:

Year (Dollars): 2003

Lifetime: 30 years


Related Unit Cost Subsystems

Roadside Telecommunications (RS-TC)

Keywords

DMS, CMS, VMS, Changeable Message Signs, Variable Message Signs

ID: 2010-00238