In 1998, the Congress designated the I-25 Truck Safety Improvements Project (I-25 TSIP) to support transportation improvements in the State of Colorado. This project was intended to improve transportation efficiency, promote safety, reduce emissions, improve traveler information, enhance alternate transportation modes, promote tourism and build on existing Intelligent Transportation Systems (ITS).

Total funding for the I-25 Truck Safety Improvements Project is $11,250,000. Of the total, $9,000,000 are federal funds (80%) and $2,250,000 are matching state funds (20%). The project was divided into tasks to address the ITS needs of the Colorado Department of Transportation (CDOT) in areas ranging from planning through detailed design and implementation. Project tasks and accompanying costs are listed in the following table.

Task
Costs
I-25 Truck Safety Reimbursement, Region 1
$1,200,000
Install AVI/WIM, I-25 Monument
$414,258
Enhance Web for CVO data. Install POE Computers
$48,000
Install AVI/WIM, I-25 Fort Collins
$480,538
Install AVI/WIM, I-70 Limon
$407,453
CTMC Operations
$681,964
ATMS/ATIS – Communications
$60,000
ATMS/ATIS – NTCIP DMS Driver
$57,000
ATMS/ATIS – Web Integration
$449,751
ATMS/ATIS – Denver Fiber Ring
$454,268
ATMS/ATIS Integration – Miscellaneous
$210,640
I-25 Interconnect, CTMC – Colorado Springs
$627,000
I-25 HAR, Region 4
$56,596
I-25 DMS, Colorado Springs
$1,190,496
I-25 DMS, Region 4
$750,000
I-25 ATR/WIM, Region 4
$84,417
1-800 Road Weather Information Line
$150,000
I-70 Hanging Lake Tunnel Integration
$288,000
Denver Area Speed Map
$200,000
I-25 Stadium Parking Management., Denver
$300,000
Develop C2C interface with City of Lakewood
$250,000
Message Paging Interface
$150,000
CCTV for Regions 1 and 6
$500,000
Colorado Springs Area Speed Map
$200,000
Statewide Speed Map
$200,000
Weather Systems Integration
$100,000
Low-Speed Communications
$820,599
Traveler Information Center (TIC)
$400,000
Public Information & Incentive Leverage
$14,130
Transit Data Integration / Kiosks
$100,000
Start-Up Tasks
$354,890
TOTAL
$11,250,000



System Cost Comments

No comments posted to date

Comment on this System Cost

To comment on this summary, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

I-25 Truck Safety Improvements Project Local Evaluation Report

Author: Stephen Sabinash

Published By: Colorado Department of Transportation

Source Date: 12/29/2004

EDL Number: 14121

Other Reference Number: FHWA-JPO-05-039

URL: https://rosap.ntl.bts.gov/view/dot/4113

System Cost

I-25 Truck Safety Improvements Project - $11,250,000.

Rating

Average User Rating

0 ( ratings)

Rate this System Cost

(click stars to rate)


Cost ID: 2015-00348