Cost

In Hattiesburg, MS, the cost to install a Traffic Management Center and 2.4 miles of fiber optic cable was $608,252.60

TMC Construction in Hattiesburg, MS


19 March 2009
Hattiesburg; Mississippi; United States


Summary Information

The construction of Phase 1 of the Hattiesburg ITS Project was completed on May 23, 2005. Phase 1 consisted of the installation of computer hardware and software at the Hattiesburg Traffic Management Center (TMC) and fiber optic cable installed underground in conduit over a 2.4 mile stretch of Hardy Street from downtown Hattiesburg to Highway 49. The fiber optic cable installation included pullboxes and fiber drops at 6 existing traffic signals along the 2.4 mile stretch of Hardy Street.

The cost to install Phase 1 was $608,252.60 and it included:
  • The cost associated with the TMC: $238,000
  • The installation of a 4" HDPE roll pipe conduit with (3) 1 ¼" interducts with a 48 count single-mode fiber optic cable installed through one of the interducts: $112,500 per mile,


System Cost Comments

No comments posted to date

Comment on this System Cost

To comment on this summary, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

Local Evaluation Report: City of Hattiesburg Intelligent Transportation System (ITS) Deployment Program - Phase I

Author:

Published By: Joint Program Office for Intelligent Transportation Systems

Source Date: 19 March 2009

EDL Number: 14453

URL: https://rosap.ntl.bts.gov/view/dot/34516

System Cost

System Cost: $608,252.60

Rating

Average User Rating

0 ( ratings)

Rate this System Cost

(click stars to rate)


Cost ID: 2009-00182