Cost Subsystem
Unit Cost Element
Unit Cost Component
Description
Tower Cost based on a wood pole (rather than steel), cost includes foundation, pole, conduit and labor. Tower is a 90 foot Abacus aluminum pole.
Capital Cost Per Unit
$12,000.00
Adjusted Capital Cost Per Unit
$12,000.00
Unit Cost Type
Unit
Each (EA)
CPI ID
9
CPI Name
WPU10740512
Year
2001