Unit Cost Entry

Unit Cost Element - Labor for Signal Control

Unit Cost Component - Labor for Arterial Management


San Francisco, California, United States


Description

Labor for Arterial Management for Central Control Signal Coordination

Cost Type

Estimated

Data Date

2008

Reported Units



Units

Per Year

Year (Dollars)

2008

Capital Cost per Unit ($)



O & M Cost per Unit ($)

$540,000.00

Lifetime

years


Notes

Labor Costs assume: Operators (2 @ 50% of the time, at $100,000). Maintenance Technicians (2 @ $75,000). Transportation Engineer (1 @ 50% of the time, at $100,000). Salary costs are fully loaded prices including base salary, overtime, overhead, benefits, etc. Update timing plans $2,000 per system per month for every 10 systems.

Source

Integrated Corridor Management: Analysis, Modeling, and Simulation Results for the Test Corridor

Author: Alexiadis, V.

Published By: U.S. Department of Transportation

Prepared by Cambridge Systematics for the U.S. DOT

URL: https://rosap.ntl.bts.gov
/view/dot/3995
Related System Cost ID: 2009-00194

Unit Cost Details

Capital Cost per Unit:

O&M Cost per Unit: $540,000.00

Year (Dollars): 2008

Lifetime: years


Related Unit Cost Subsystems

Transportation Management Center (TM)

Keywords

coordinated signals, signal coordination, centralized signal control, signal synchronization, traffic signals, advanced signal control, signal timing optimization, coordinated signal control, advanced signal controller, traffic signal retiming, retiming

ID: 2012-02234