Unit Cost Entry

Unit Cost Element - Design & Development

Unit Cost Component - Systems Engineering Support to Test a Multi-Agency AVL System


Michigan, USA


Description

Systems engineering: Includes labor for system design, factory acceptance test, system acceptance test, and related travel.

Cost Type

Actual

Data Date

2002

Reported Units



Units

Lump Sum (LS)

Year (Dollars)

2002

Capital Cost per Unit ($)

$609,800.00

O & M Cost per Unit ($)



Lifetime

years


Notes

"Construction and Maintenance" is the subsystem category established for projects of this type by SEMCOG in the SE Michigan regional ITS architecture. The Southeast Michigan Snow and Ice Management Project is a multi-agency AVL system in which highway maintenance vehicles are equipped with GPS receivers, and sensors to monitor snow plow use, rates of application for de-icing materials, and ambient air and pavement temperature. Vehicle data is transmitted via 900 Mhz radio to a central server which can be accessed from client work stations located at each partner agency.

Source

ITS Integration Program Unit Cost Data Collection Sheet: SEMSIM Planning - Southeast Michigan, MI (FY99 Yr2)

Author: Dennis Kolar, Road Commission for Oakland County


Unit Cost Details

Capital Cost per Unit: $609,800.00

O&M Cost per Unit:

Year (Dollars): 2002

Lifetime: years