Unit Cost Entry

Unit Cost Element - Labor for Freeway Control

Unit Cost Component - TMC Labor


California, USA


Description

for Central Control Ramp Metering

Cost Type

Estimated

Data Date

2007

Reported Units



Units

Per Year

Year (Dollars)

2007

Capital Cost per Unit ($)



O & M Cost per Unit ($)

$250,000.00

Lifetime

years


Notes

Labor costs assume: operators (2@ 50% of the time, at $100,000), maintenance technicians (2 @ $75,000)

Source

Integrated Corridor Management: Analysis, Modeling, and Simulation Results for the Test Corridor

Author: Alexiadis, V.

Published By: U.S. Department of Transportation

Prepared by Cambridge Systematics for the U.S. DOT

URL: https://rosap.ntl.bts.gov
/view/dot/3995
Related System Cost ID: 2009-00194

Unit Cost Details

Capital Cost per Unit:

O&M Cost per Unit: $250,000.00

Year (Dollars): 2007

Lifetime: years


Related Unit Cost Subsystems

Transportation Management Center (TM)

Keywords

None defined

ID: 2010-01379