Unit Cost Entry

Unit Cost Element - Conduit Design and Installation - Corridor

Unit Cost Component - Conduit Design and Installation - Corridor


Colorado, USA


Description

Conduit design and installation. $50k per mile cost is normal; $100k possible in dense urban areas; $250k possible for rock or in-shoulder installation in mountains.

Cost Type

Actual

Data Date

2005

Reported Units



Units

Per Mile

Year (Dollars)

2005

Capital Cost per Unit ($)

$50,000.00

O & M Cost per Unit ($)



Lifetime

20 years


Notes

*2005*

Source

ITS Integration Program Unit Cost Data Collection Sheet: CTMC Integration - CO (FY01)

Author: Saeed Sobhi


Unit Cost Details

Capital Cost per Unit: $50,000.00

O&M Cost per Unit:

Year (Dollars): 2005

Lifetime: 20 years