Unit Cost Entry

Unit Cost Element - Lane Control Sign (Installed)

Unit Cost Component - Automated Work Zone Information System


San Diego, California, USA


Description

Automated Work Zone Information System (AWIS) acquires traffic data throughout the work zone and display predetermined information to motorists automatically without operator intervention after system initialization. Lump Sum price includes furnishing, installing, operating, and maintaining the AWIS during interchange modification and overcrossing widening project with duration of 750 work days.

Cost Type

Bid Tabulation

Data Date

2016

Reported Units

1

Units

Lump Sum (LS)

Year (Dollars)

2016

Capital Cost per Unit ($)

$53,000.00

O & M Cost per Unit ($)



Lifetime

years


Notes

Bidder 1

Source

State of California DOT Notice To Bidders and Special Provisions for Construction on State Highway in San Diego County in San Diego (Contract No. 11-085784)

Published By: Caltrans District 11

Other Reference Number: 11-SD-163-4.1/4.9

URL: http://www.dot.ca.gov/hq/
esc/oe/project_ads_addend
a/11/11-085784/specs/11-0
85784sp.pdf
Related System Cost ID: 2017-00388

Unit Cost Details

Capital Cost per Unit: $53,000.00

O&M Cost per Unit:

Year (Dollars): 2016

Lifetime: years


Related Unit Cost Subsystems

Roadside Information (RS-I)

Keywords

smart work zone systems, smart work zone, smart work zones, Smart work zones, workzone, WZ

ID: 2017-05255