Content references source material no longer available at its original location.
Cost Subsystem
Unit Cost Component
Description
Furnish and install conduit for variable message sign.
Capital Cost Per Unit
$5.00
Adjusted Capital Cost Per Unit
$5.71
Reported Units
1057
Unit Cost Type
Unit
Linear Foot (LF)
CPI ID
1
CPI Name
WPU1176
Year
2007
Notes
Louisville-Nashville Road I-65 (Kentucky) Bid Tab Data (No.2)