Cost

In Spokane, Washington, the cost of integrating ITS field devices with fiber optic links and a microwave link was $1,837,251.

ITS improvements in the Spokane area of Washington state.


June 2009
Spokane; Washington; United States


Summary Information

The goals of this project were to integrate existing and new ITS field devices into the existing fiber communications system and to provide real-time video and data from those devices to emergency response agencies. This project integrated ITS field devices including CCTVs with fiber optic and microwave communications links for providing real-time video and data to emergency response agencies. The project constructed center-to-center and trunk line communications between agencies, and expanded communications capacity to prepare for future deployments.

The project constructed the following communications links:
  • a fiber optic trunk line on Division (SR 2) from Houston Avenue to Farwell Road
  • a microwave link to the WSP offices on Geiger Avenue that provided access to CCTV images
  • a fiber optic link to the CCC, the joint City/County police, fire, and 911 dispatch facility that also houses Spokane County’s EOC
The total cost of the Spokane Area Intelligent Transportation Integration project was $1,837,251.


System Cost Comments

No comments posted to date

Comment on this System Cost

To comment on this summary, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

ITS Evaluation Framework - Phase 2 Continuation (2009) Seventeen Projects

Author: Peter M. Briglia, Jr.

Source Date: June 2009

URL: http://www.wsdot.wa.gov/research/reports/fullreports/672.2.pdf

System Cost

Integrating ITS field devices with communications links (CCTVs and 3 links) - $1,837,251

Rating

Average User Rating

0 ( ratings)

Rate this System Cost

(click stars to rate)


Costs From This Source

In Wenatchee, Washington, the construction of a Transportation Management Center (TMC) and the installation of the associated ITS field equipment cost $460,000.

In central Washington state, the cost of deploying two variable message signs (VMS) on westbound Interstate 90 was $660,000.

In Edmonds, Washington, connecting six arterial traffic signals and five CCTV cameras to a central signal system cost $90,000.

In Kent, Washington, the cost of connecting five arterial traffic signals and five CCTV cameras to a central signal system and another traffic management center was $92,000.

In Nisqually Valley, Washington, an Ice Warning System consisting of a road weather information system (RWIS) station and closed-circuit television (CCTV) camera cost $165,000.

In Snohomish County, Washington, interconnecting five traffic signals and three CCTV cameras to a central signal system cost $91,000.

In Spokane Washington, the cost of the Regional Traffic Management Center Enhancements project was $1,238,679.

In Spokane, Washington, the cost of integrating ITS field devices with fiber optic links and a microwave link was $1,837,251.

In Vancouver, Washington, expanding the region's communications system by installing over 6 miles of fiber optic cable cost $1.5 million.

In Washington State, a traveler information system was installed between the Washington-Oregon border at a cost of $358,000.

In Washington State, the implementation of the SR 14 Traveler Information System cost $511,300

In Washington state, the Mount St. Helens traveler information system was installed at a cost of $499,526.

In Yakima, Washington, the deployment of a Traveler Information System cost $333,000.