The cost to implement and operate a dynamic lane merge system for 11 weeks was estimated at $57,108.

Case study of wok zone ITS applications in Kalamazoo, Michigan

Made Public Date
12/17/2013
Identifier
2013-SC00293
TwitterLinkedInFacebook

Summary Information

This study tested the use of a dynamic late lane merge system installed at three work zones on I-94 and I-64 in Michigan during the 2006 construction season (July 17, 2006 through October 9, 2006). The system used microwave traffic sensors, a master controller with wireless communications, and a series of portable dynamic message signs (DMS) to advise drivers of definite merge points when average traffic speeds dropped below pre-set threshold levels.

Cost data collected as part of an economic analysis used to assess the economic viability of the system are shown below.
 

Item
Quantity
Unit Cost
Cost
DLMS (furnished)
1
$43,552
$43,552
DLMS (operated)
1
$36
$36
Portable DMS with wireless communications (furnished)
4
$2,830
$11,320
Portable DMS with wireless communications (operated)
4
$550
$2,200
 
 
TOTAL
$57,108
System Cost

DLMS with 4 DMS (capital costs): $54,872. DLMS with 4 DMS (operating costs): $2,236.