Unit Cost Entry

Unit Cost Element - Conduit Design and Installation - Corridor

Unit Cost Component - Electrical pull box


Colorado, United States


Description

Electrical Pull Box (24"x36"x24"). Purchased and installed.

Cost Type

Bid Tabulation

Data Date

2016

Reported Units

10

Units

Each (EA)

Year (Dollars)

2016

Capital Cost per Unit ($)

$1,500.00

O & M Cost per Unit ($)



Lifetime

years


Notes

This is part of a CDOT engineer's cost estimate. The project includes replacing 13 ITS Weather Stations (RWIS). Towers and sensors will both be replaced, plus the addition of Cellular Modems and Non-Intrusive Sensors. ITS infrastructure to be included with this project includes: bored conduit, trenched conduit, pull boxes, location markers, light standards/foundations, and service meter cabinets.

Source

Colorado Department of Transportation Bid Tabulation Data (ITS SW01-622)

Published By: Colorado DOT


Unit Cost Details

Capital Cost per Unit: $1,500.00

O&M Cost per Unit:

Year (Dollars): 2016

Lifetime: years


Related Unit Cost Subsystems

Roadside Detection (RS-D)

Keywords

RWIS, ESS, Environmental Sensor Station, RWIS Station, road monitoring, weather station, environmental sensing station

ID: 2018-05327