Minnesota DOT deployed a dynamic late merge system for $900 per day per direction.


September 12, 2005
Minnesota,United States


Summary Information

The Federal Highway Administration (FHWA) partnered with the American Association of State Highway and Transportation Officials (AASHTO) to encourage the implementation of work zone ITS through an AASHTO Technology Implementation Group (TIG) project. This effort led to a workshop in September 2005, in St. Louis, MO. Sue Groth, Assistant State Traffic Engineer, gave a presentation on implementation of a dynamic late merge system (DLMS) and other work zone ITS applications.

Minnesota Department of Transportation's (Mn/DOT’s) Construction Office and Traffic Office developed a specification for a DLMS and worked closely with the vendor capable of providing the system. Mn/DOT reviewed other state DOT's (e.g., Michigan, Kansas, and Maryland) experience with dynamic merge technologies to determine the proper strategy for Mn/DOT work zones. The system Mn/DOT deployed provided guidance to motorists on proper lane usage via portable changeable message signs (PCMS). When congestion level was reached, the PCMS were activated. When traffic returned to free-flow the PCMS returned to “dark mode.” The costs provided were based on four DLMS study locations: three in urban settings and one in a rural location. The cost of detection was approximately $300 per day and three PCMS cost $600 per day for a total cost of $900 per day per direction.

For the 2005 construction season, Mn/DOT will include DLMS as a pay item in construction projects and require vendors to be on a Qualified Product List (QPL).


System Cost Comments

No comments posted to date

Comment on this System Cost

To comment on this summary, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

Mn/DOT Work Zone ITS Contracts and Specification (Presentation)

Author: Sue Groth, Assistant State Traffic Engineer, Minnesota DOT

Source out of date

Published By: Minnesota DOT

Presentation to ITS in Work Zones Workshop/Peer Exchange, September 2005

Source Date: September 12, 2005

URL: http://tig.transportation.org/sites/aashtotig/docs/ContractsSpecifications_9-9-05_Workshop.pdf

System Cost

Dynamic Late Merge System cost: $900 per day per direction.

Rating

Average User Rating

0 ( ratings)

Rate this System Cost

(click stars to rate)


Keywords

smart work zone systems, smart work zone, smart work zones, Smart work zones, workzone, WZ, Dynamic Message Signs, CMS, VMS, Changeable Message Signs, Variable Message Signs, construction warning signs, Portable Dynamic Message Signs, portable CMS, portable VMS, portable Changeable Message Signs, portable Variable Message Signs, Temporary Dynamic Message Signs, Temporary CMS, Temporary VMS, Temporary Changeable Message Signs, Temporary Variable Message Signs

Cost ID: 2006-00108