Lesson

Provide early outreach and education to elected officials, decision makers, key stakeholders, and the public about managed lanes and variable tolls.

Lessons from a domestic scan of ten metropolitan areas.


April 2009


Background (Show)

Lesson Learned

To gain stakeholder and public acceptance and support,
  • Provide early outreach and education for elected officials, decision makers, key stakeholders and the public. Regional agencies should not be afraid to put the concept of congestion pricing out for consideration. Acceptance of new pricing concepts by decision makers and the public may take some "digestion" time. Many issues will be raised that can be addressed with technical analysis or information from other successful operating systems.
  • Implement an education process that emphasizes that congestion pricing is a tool that a metropolitan area can utilize as one component of reducing traffic congestion in a metropolitan region. Congestion pricing projects can assist metropolitan areas in developing a balanced transportation system for their regions.
  • Identify a project champion or a "concept champion" during the planning process. Buy-in from local and state-level elected officials will go a long way in gaining positive (or at least not negative) support for the concept or a specific project utilizing the concept.
  • Initiate a marketing campaign during the planning process to inform the public/stakeholders about the concepts and benefits of managed lanes and/or congestion pricing. Public buy-in on the concept is essential for it to move forward and be successful.
  • Conduct on-going communication with potential users, adjacent communities, transportation providers, policy makers, local governments and elected officials before, during and after project implementation.
  • Consider how you refer to the aspects of congestion pricing (toll, price, fare, fee, etc.) as that can have an influence on public and decision maker support.
  • Increase public and political support by showing there is some benefit for everyone. This often means that some portion of revenue from tolls should be used to enhance other modes of travel, such as transit, and that transit service be integrated into the project design so that transit passengers benefit directly.
  • Emphasize that congestion tolls alone usually cannot fully fund construction of new highways or complete reconstruction of existing highways. The expectations for revenue generation by decision makers and the public are often over-inflated.
  • Plan carefully the make-up of an advisory task force when trying to achieve informed consent on complex and controversial projects. Legislators working alongside community representatives, citizens, interest groups, and technical experts can provide a productive and meaningful deliberative opportunity.
  • Conduct site visits to other high occupancy toll (HOT) lane and express lane projects as these can play a critical role in increasing stakeholders' or decision makers' understanding of how value pricing works.
  • Translate an initial success in a region into support for other projects.


Lesson Comments

No comments posted to date

Comment on this Lesson

To comment on this lesson, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

A Domestic Scan of Congestion Pricing and Managed Lanes

Published By: U.S DOT Federal Highway Administration

Prepared by DKS Associates for the FHWA

Source Date: April 2009

URL: http://ops.fhwa.dot.gov/publications/fhwahep09044/fhwahep09044.pdf

Other Lessons From this Source

Lesson Contacts

Lesson Analyst:

Liz Greer
Noblis
202-551-1164
Elizabeth.Greer
@Noblis.org


Rating

Average User Rating

0 ( ratings)

Rate this Lesson

(click stars to rate)

States

None defined

Countries

None defined

Focus Areas

None defined

Goal Areas

Mobility
Productivity

Keywords

None defined

Lesson ID: 2013-00663