Unit Cost Entry

Unit Cost Element - Conduit Design and Installation - Corridor

Unit Cost Component - Conduit Design and Installation - Corridor


Fort Collins, Colorado, USA


Description

Conduit design and installation.

Cost Type

Actual

Data Date

2005

Reported Units



Units

Per Mile

Year (Dollars)

2005

Capital Cost per Unit ($)

$54,300.00

O & M Cost per Unit ($)



Lifetime

20 years


Notes

Project Total: Installation included 33.5 miles.

Source

ITS Integration Program Unit Cost Data Collection Sheet: Ft Collins ATMS - Fort Collins, CO (FY01 Yr2)

Author: Ward Stanford


Unit Cost Details

Capital Cost per Unit: $54,300.00

O&M Cost per Unit:

Year (Dollars): 2005

Lifetime: 20 years