Unit Cost Entry

Unit Cost Element - Conduit Design and Installation - Corridor

Unit Cost Component - Conduit


Tucson, Arizona, United States


Description

ELECTRICAL CONDUIT (3" HDPE) (DIRECTIONAL DRILL)

Cost Type

Estimated

Data Date

2009

Reported Units

705

Units

Linear Foot (LF)

Year (Dollars)

2009

Capital Cost per Unit ($)

$16.16

O & M Cost per Unit ($)



Lifetime

years


Notes

Arizona Bid Tab 2009096 - Bidder 2

Source

Arizona DOT Intermodal Transportation Division Contracts and Specifications Section: Tabulation of Bids - Bid Results for 2009096

Author: James, Carroll

Published By: Arizona DOT

Related System Cost ID: 2012-00251

Unit Cost Details

Capital Cost per Unit: $16.16

O&M Cost per Unit:

Year (Dollars): 2009

Lifetime: years