Cost

In Colorado, a Transportation Management Center (TMC) integration project cost $6,753,160.

Construction of a TMC in Colorado


November 9, 2007
Colorado; United States


Summary Information

The Colorado Transportation Management Center (CTMC) Integration Project was the result of FY01congressionally designated funds intended to improve transportation efficiency; promote safety; increase traffic flow; reduce emissions; improve traveler information; enhance alternate modes; promote tourism and build on existing Intelligent Transportation Systems (ITS). Total project investment was $6,753,160; which included $3,372,862 in federal funds, and $3,380,298 of State cash match provided by the Colorado Department of Transportation (CDOT).

The cost breakdown for the CTMC Integration project was as follows:
  • Task 1- New CTMC facility: $1,503,050. These funds were devoted to the new CTMC building and split into three sub-tasks.
    • $137,000 for the 2003 transition planning and gap analysis; non-specific new CTMC location.
    • $140,050 for the 2005 CTMC computer room transition, hardware, rack, network, cabling, electrical, telephone, communications, and miscellaneous design assistance.
    • $1,225,000 for the 2005 new CTMC building project management, design, coordination, and inspection.
  • Task 2- ATMS/ATIS Hardware, Firmware, Database and Operating Systems: $1,031,890. This task comprises primarily those items "supporting" ATMS/ATIS software development – servers, training, etc.
  • Task 3- ATMS/ATIS Software Integration: $2,961,415. Primarily ATMS/ATIS software development.
  • Task 4- ATMS/ATIS General Integration: $1,256,805. Primarily ATMS/ATIS software development.
The breakdown for the subtasks for Tasks 2-4 are shown in the table below:

Work Item
Task 2
Task 3
Task 4
Total
Integrator RFP Development
-
-
$65,000
$65,000
Architecture/Overall System Design
-
$955,000
-
$955,000
[General] Test and Documentation
$405,852
-
-
$405,852
Iteration 1 Management/Administration
-
-
$326,827
$326,827
Iteration 1 Software Development
-
$1,112,914
-
$1,112,914
Iteration 2 Management/Administration
-
-
$211,181
$211,181
Iteration 2 Software Development
-
$893,501
-
$893,501
Iteration 3 All Tasks (Partial)
-
-
$472,313
$472,313
[General] Network Administration
-
-
$69,476
$69,476
[General] Software Coding I
-
-
$62,900
$62,900
[General] Software Coding II
-
-
$49,108
$49,108
Video Wall
$346,932
-
-
$346,932
Miscellaneous Items I*
$155,998
-
-
$155,998
Miscellaneous Items II**
$121,306
-
-
$121,306
Total Project Investment
$1,031,890
$2,961,415
$1,256,805
$5,250,110
* miscellaneous items include (among others) off-the-shelf software; leased (Oracle) software; software licenses; office supplies; safety materials; operator and/or PIO workstations; and other technical support and training.
** miscellaneous items include (among others) Cisco consoles; DigiPort server; Smart Array; VM Ware; books and reference materials; flat panel monitor(s); ArcIMS; laptops; Legato training; and Java software and training.


System Cost Comments

No comments posted to date

Comment on this System Cost

To comment on this summary, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

Colorado Transportation Management Center (CTMC) Integration Project (FY01 Earmark) Local Evaluation Report

Author: John V. Nelson, Colorado Department of Transportation Steven J. Sabinash, P.E., Centennial Engineering, Inc.

Published By: Federal Highway Administration (FHWA) Colorado Division

Source Date: November 9, 2007

EDL Number: 14435

URL: https://rosap.ntl.bts.gov/view/dot/4048

System Cost

$6,753,160