Unit Cost Entry

Unit Cost Element - Signal Preemption Processor

Unit Cost Component - On-Board Signal Preemption Processor - Transit


Florida, USA


Description

Transit. from the Broward County GPS-based system. The cost of this device is expected to vary widely based on the technology used.

Cost Type

Actual

Data Date

2003

Reported Units



Units

Each (EA)

Year (Dollars)

2003

Capital Cost per Unit ($)

$2,200.00

O & M Cost per Unit ($)



Lifetime

years


Notes

Broward County - per vehicle

Source

Intelligent Transportation System Deployment Analysis System Customization: Technical Memorandum No.4 - Florida-Specific Intelligent Transportation System Deployment Costs Version 2

Author: Hadi, Mohammed and Prasoon Sinha

Published By: Florida DOT, Traffic Engineering and Operations Office, ITS Section

URL: http://www.floridaits.com
/PDFs/TWO17_IDAS/040805-T
M4-V2.pdf
Related System Cost ID: 2008-00162

Unit Cost Details

Capital Cost per Unit: $2,200.00

O&M Cost per Unit:

Year (Dollars): 2003

Lifetime: years