Cost

A Minnesota integrated communications system project to share application of ITS across transportation, public safety, and transit agencies cost just over $1.5 million.

From the Rural ITS Toolbox report: Subsection 8.1 Integrated Communication Systems


November 2001
Minnesota,United States


Summary Information

The purpose of the Advanced Rural Transportation Information and Coordination (ARTIC) project in Minnesota was to share application of ITS across various public agencies such as transportation, public safety, and transit utilizing a central communications and dispatching center. AVL/GPS equipment was installed on fleet vehicles for ease of location, identification, and dispatching. Mobile data terminals (MDTs) were also installed allowing for data transmission between the vehicles and the dispatch center. AVL and MDTs were installed on 15 Mn/DOT vehicles, 4 Minnesota State Police (MSP) vehicles, and 15 transit buses. To demonstrate the capability of transmitting data from fleet vehicles to the center, an interface was developed between the MDTs and the sand spreader control on the snow plows.

The total project cost was $1.574 million. Funding for the project came from three primary sources: federal ($903,000), state ($622,000), and other partners ($49,000).

See Also:
Advanced Rural Transportation Information and Coordination (ARTIC) Operational Test Evaluation Report. Prepared for the Minnesota DOT, Office of Advanced Transportation Systems by: Short Elliott Hendrickson Inc. and C.J. Olson Market Research, July 2000. Available at http://www.itsdocs.fhwa.dot.gov//JPODOCS/REPTS_TE//13328.PDF.

Rural ITS Toolbox (Sections 6.1 and 6.2). Prepared for the Federal Highway Administration by SAIC (FHWA-OP-01-030). Washington, DC. November 2001. Available at http://www.itsdocs.fhwa.dot.gov//JPODOCS/REPTS_TE/13477.html.

Notes:
Click here for a diagram showing the ARTIC system components and data flow.


System Cost Comments

No comments posted to date

Comment on this System Cost

To comment on this summary, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

Rural ITS Toolbox

Author: Deeter, D., H. M. Zarean, and D. Register

Published By: U.S. DOT Federal Highway Administration

Source Date: November 2001

EDL Number: 13477

Other Reference Number: FHWA-OP-01-030


System Cost

Project cost: $1.574 million.

Rating

Average User Rating

0 ( ratings)

Rate this System Cost

(click stars to rate)


Costs From This Source

A bicycle safety system was installed for $5,000 at a tunnel near Chelan, Washington.

A Minnesota integrated communications system project to share application of ITS across transportation, public safety, and transit agencies cost just over $1.5 million.

A pedestrian safety system was deployed in downtown Boulder, Colorado; total project cost ranged from $8,000 to $16,000.

A variable speed limit system consisting of multiple ITS components and covering 40 miles over the Snoqualmie Pass in Washington was designed and implemented for $5 million.

Animal warning system deployed in the Greater Yellowstone Rural Intelligent Transportation Systems (GYRITS) corridor at a cost of $3,800 per site.

Colorado DOT deployed a truck speed warning system in Glenwood Canyon at a cost ranging from $25,000 to $30,000.

During a pilot project Minnesota State Patrol vehicles were equipped with an accident investigation system at a cost of $8,000 to $10,000 per vehicle.

Emergency preemption equipment was deployed at several intersections in British Columbia, Canada at a cost of $4,000 (Canadian) per intersection.

The cost to equip a police vehicle in Dane County, Wisconsin for coordinated interagency incident response was $8,000 to $10,000.

Benefits From This Source

In Colorado, a downhill truck speed warning system installed on a curved section of I-70 reduced 85th percentile truck speeds by 27 percent.

Lessons From This Source

Provide traveler information in rural areas to allow for good travel decisions in inclement weather and construction season.

Use speed warning signs on dangerous curves to reduce speeds of trucks.

Cost ID: 2003-00050