Cost

In Denver, the cost for a pilot of self-driving low-speed shuttles was $150,000.

Autonomous shuttle test in Denver, CO.


01/31/2019
Denver,Colorado,United States


Summary Information

In January 2019, Denver's Regional Transportation District launched a pilot of a low speed autonomous shuttle on public roads. The project's objectives are to:
  • Introduce AV technology safely on a public roadway in the Denver metro area
  • Provide additional connectivity between station and businesses and residential areas
  • Explore first/last mile solutions for future growth throughout the District
  • Test AV technology in a transit setting.
The agency leased EasyMile's 12-passenger self-driving, a four-wheel electric vehicle with no steering wheel or pedals, for its pilot. The shuttle operates on a 1-mile circulator route near the Denver airport following a regular bus route. It runs every 15 minutes from 10 AM to 6 PM on weekdays, mostly using public streets.

The EZ10 has no steering wheel or brake pedal and navigates autonomously using pre-mapped routes. It has a maximum speed of 25 mi/h, but the typical operating speed is 12 to 15 mi/h. An attendant is onboard to answer questions, and the vehicle is monitored remotely.

The cost of the pilot was estimated at $150,000.


System Cost Comments

No comments posted to date

Comment on this System Cost

To comment on this summary, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

Self-driving shuttle offers Denver a glimpse of its future — but will riders jump on board?

Author: Murray, Jon

Published By: The Denver Post MediaNews Group

Source Date: 01/31/2019

URL: https://www.denverpost.com/2019/01/31/denver-airport-self-driving-shuttle-easymile/

System Cost

Autonomous shuttle bus operational test: $150K.