Unit Cost Entry

Unit Cost Element - Infrastructure

Unit Cost Component - TRENCHING AND BACKFILLING


Kentucky, USA


Description

Trench and backfill for variable message sign connection

Cost Type

Actual

Data Date

2006

Reported Units

6572

Units

Linear Foot (LF)

Year (Dollars)

2006

Capital Cost per Unit ($)

$5.00

O & M Cost per Unit ($)



Lifetime

years


Notes

I-65 Lincoln Trail Area KTC (Kentucky) Bid Tab Data (No.1)

Source

KYTC Highway District 4 ITS: Letting of 3-31-2006

Author: Kentucky Transportation Cabinet

URL: http://transportation.ky.
gov/Contract/Lettings/200
6/0331/ http://transporta
tion.ky.gov/Contract/Lett
ings/2006/0331/Notice%20t
o%20Contractors%20-%20Part%203.pdf http://transportation.ky.gov/Contract/Lettings/2006/0331/Unit%20Bid%20Tabulations.pdf

Unit Cost Details

Capital Cost per Unit: $5.00

O&M Cost per Unit:

Year (Dollars): 2006

Lifetime: years