The Illinois DOT reduced operating costs during the reconstruction of I-55 by deploying an automated traffic control system and eliminating the need for constant traffic monitoring.
Date Posted
01/19/2007
Identifier
2007-B00404
TwitterLinkedInFacebook

Intelligent Transportation Systems in Work Zones: A Case Study - Real Time Work Zone Traffic Control System

Summary Information

The Illinois DOT used ITS during reconstruction of a 40-mile section of Interstate 55 including the Lake Springfield Bridge. Reconstruction of the bridge involved closing the southbound span and diverting southbound traffic onto the northbound span, and then reversing the process once work on the southbound span was complete. To minimize congestion and improve safety in the work zone, the DOT deployed a Real Time Traffic Control System (RTTCS) from February 2001 to May 2002. The RTTCS consisted of 17 portable dynamic message signs (DMSs), 8 portable vehicle detectors, and 4 portable closed circuit television (CCTV) cameras linked to a central computer via a wireless communication system. The field components were solar powered.

The DMSs displayed a variety of messages including delay information, lane closure advisories, and the number of citations for moving violations. The CCTV camera images were used to confirm traffic and incident data. The central computer monitored traffic flow data from the vehicle detectors, calculated delay at each detector location, automatically displayed preprogrammed messages on DMSs, updated a real-time traffic condition map on the project website, and provided congestion and incident alerts for Illinois DOT staff via email or pager.

Although no official evaluation of the RTTCS was performed, DOT officials were satisfied with the performance of the system. The automated system design minimized operating costs by eliminating the need for constant monitoring, since the appropriate personnel were automatically alerted only when human intervention was needed. Further, the DOT avoided hardware procurement costs by securing use of the system only for the 15-month duration of the project.