Unit Cost Entry

Unit Cost Element - Other Unit Cost Elements

Unit Cost Component - Electrical Conduit


Colorado, USA


Description

2 Inch Electrical Conduit (Bored). Purchase and installation.

Cost Type

Bid Tabulation

Data Date

2017

Reported Units

180

Units

Linear Foot (LF)

Year (Dollars)

2017

Capital Cost per Unit ($)

$35.00

O & M Cost per Unit ($)



Lifetime

years


Notes

Variable Message Sign (VMS) upgrades in Region 1 and Region 3 (Arapahoe, Clear Creek, Delta, Garfield, Gunnison, Lake, and Mesa Counties), work consists of installation of new VMSs, monotube cantilever structures, caissons, cellular modems, pull boxes, bored and trenched conduit, and the reset of CCTVs, TTIs, and communications equipment. (Engineers Cost Estimate)

Source

Colorado Department of Transportation Bid Tabulation Data (ITS SW01-636)

Published By: Colorado DOT

Other Reference Number: Letting No. 20171019

URL: https://www.codot.gov/bus
iness/bidding/bid-tab-arc
hives/bid-tabs-2017/its-s
w01-636-20984

Unit Cost Details

Capital Cost per Unit: $35.00

O&M Cost per Unit:

Year (Dollars): 2017

Lifetime: years


Related Unit Cost Subsystems

Roadside Telecommunications (RS-TC)

Keywords

DMS, CMS, VMS, Changeable Message Signs, Variable Message Signs

ID: 2018-05307