Unit Cost Entry

Unit Cost Element - Infrastructure

Unit Cost Component - Charging station (solar)


San Francisco, California, United States


Description

Solar photovoltaic canopy system with management systems and optional on-site energy-storage system (250kWh). Includes purchase and installation.

Cost Type

Estimated

Data Date

2019

Reported Units

1

Units

Location

Year (Dollars)

2019

Capital Cost per Unit ($)

$175,000.00

O & M Cost per Unit ($)



Lifetime

years


Notes

Integrate EV fleet needs into Fort Scott area redevelopment planning and design.

Source

PresidiGo Capital Plan: A Technical Analysis of Alternative Transit Fleet Fuels and Transition Strategy

Author: Lian, S.; E. Simmons; and K. Mulder

Published By: Presidio Trust

Other Reference Number: DOT-VNTSC-PRESIDIO-19-01

URL: https://rosap.ntl.bts.gov
/view/dot/38691

Unit Cost Details

Capital Cost per Unit: $175,000.00

O&M Cost per Unit:

Year (Dollars): 2019

Lifetime: years


Related Unit Cost Subsystems

Non-ITS

Keywords

None defined

ID: 2019-05403