Unit Cost Entry

Unit Cost Element - Inductive Loop Surveillance on Corridor

Unit Cost Component - Loop Detector Wire


Elgin, Illinois, USA


Description

Preformed Detector Loop (Furnish and Install)

Cost Type

Bid Tabulation

Data Date

2015

Reported Units

258

Units

Linear Foot (LF)

Year (Dollars)

2017

Capital Cost per Unit ($)

$26.70

O & M Cost per Unit ($)



Lifetime

years


Notes

Project Description: Road and Bridge Reconstruction, Elgin O'Hare Western Access Tollway (IL 390) from West of Park Boulevard to East of Arlington Heights Road, M.P. 10.1 to M.P. 13.6. (Bidder 3)

Source

Illinois State Toll Highway Authority - Bid Tabulation Report (1-13-4629)

Published By: Illinois State Toll Highway Authority

Other Reference Number: Project number: 1-13-4629

URL: https://www.illinoistoll
waybidding.com/jobs/678/s
pecs/bid-tabulations

Unit Cost Details

Capital Cost per Unit: $26.70

O&M Cost per Unit:

Year (Dollars): 2017

Lifetime: years


Related Unit Cost Subsystems

Roadside Detection (RS-D)

Keywords

None defined

ID: 2017-05200