Sample Unit Cost Entries (8 unique unit cost entries found)

Unit Cost Entries for Basic Facilities, Comm. for Large Area - TM

Unit Cost ElementUnit Cost ComponentDescriptionLocationCost TypeData DateReported UnitsUnitsYear (Dollars)Capital Cost Per UnitO& M Cost Per UnitLifetime (Years)View Details
Basic Facilities, Comm. for Large Area - TMBasic Facilities, Comm for Large AreaCost based on physical building cost/ comm infrastructure. This is based on the 12,000 sq.ft. building for Artemis Control Center in Cincinnati. Includes all costs from ground-breaking to ribbon-cutting. Miami also has a 12,000 sq.ft. building that was remodeled for Florida DOT.Miami, Florida, USAActual2001Lump Sum (LS)2001$12,000,000.00$60,000.0020View Details
Basic Facilities, Comm. for Large Area - TMSMART SunGuide TMCSMART SunGuide TMCFort Lauderdale, Florida, USAEstimated2005Per Year2005$1,964,089.00View Details
Basic Facilities, Comm. for Large Area - TMSMART SunGuide TMCSMART SunGuide TMCFort Lauderdale, Florida, USA2006Per Year2006$2,112,820.00View Details
Basic Facilities, Comm. for Large Area - TMTMC - Basic Facilities, Comm.O&M = Operation Costs – The RTMC is to handle the CCTV, DMS, and detour control. building ommunications, software, hardware, labor, and integration.Florida, USAActual2003Location2003$3,998,495.00$300,000.0015View Details
Basic Facilities, Comm. for Large Area - TMTMC - Basic Facilities, Comm.LOW 0&M DISTRCT 2 DATA. power back-up systems, utility costs, telephone line costs, and daily operational costs. The low value is based on District 2 data. The high value is based on District 6 data.Florida, USA2003Location2003$100,000.00View Details
Basic Facilities, Comm. for Large Area - TMTMC - Basic Facilities, Comm.HIGH O&M DISTRICT 6 DATA. power back-up systems, utility costs, telephone line costs, and daily operational costs. The low value is based on District 2 data. The high value is based on District 6 data.Florida, USA2003Location2003$500,000.00View Details
Basic Facilities, Comm. for Large Area - TMTMC - Basic Facilities, Comm.$181 per square foot (ft2) [$181 per 0.0929 square meters (m2)] – The costs presented are based on the ITS Package C equipment deployment, including a 32,000 ft2 [2973 m2] SunGuideSM transportation management center (TMC).Florida, USAActual2003Location2003$5,792,000.00$236,430.0020View Details
Basic Facilities, Comm. for Large Area - TMTMC - Basic Facilities, Comm.$220/ft2 [$220/.0929 m2] – a two-story facility and includes District 7’s TMC and the Florida Highway Patrol (FHP) Troop C dispatch center.Florida, USAActual2003Location2003$4,285,600.0060View Details