An optimized traffic signal timing project in Allegheny County, PA resulted in a benefit-cost ratio of 57:1 along the corridor.

Content references source material no longer available at its original location.
FINDINGSResults showed that the peak travel times were reduced significantly. Average travel times were reduced by 6 percent, average stops decreased by 6 percent, and signal delay decreased an…