Cost

The City of Tyler, Texas deployed Adaptive Control System (ACS)-Lite on a 3.17-mile corridor at a cost of $546,900.


12/09/2007
Tyler,Texas,United States


Summary Information

In November 2007, the City of Tyler deployed the Adaptive Control System (ACS)-Lite technology along a 3.17-mile corridor. The deployment included the following costs: $150,600 for the software module, $38,400 for traffic communication system upgrades, and $357,900 for detection devices.

Citing the results of a study of the ACS installation, an article in the Tyler Paper (Sunday, December 09, 2007) reported the following improvements:
  • Weekday morning: At peak traffic hours in the morning, motorists experienced the largest drop in drive time, with the average trip time in both directions dropping from just more than nine minutes each way to less than six minutes. On average, motorists’ amount of stops dropped from 2.9 on the route to one stop per trip while traveling north, and from 3.1 to two per trip travelling south.
  • Midday: The average northbound trip time dropped from about 9.5 minutes to 8 minutes and 46 seconds, and the southbound trip was taking seven minutes, which was only nine seconds less than what it was before.
  • Weekday evening: At peak evening hours, the northbound trip time was down by about 40 seconds to just less than nine minutes and the southbound trip time down by about a minute to less than eight minutes a trip.
The article also cites the City Traffic Engineer saying, "I've been really impressed with the reduced number of stops people are experiencing (up to two less per trip depending on the time of day), and during the times of day where the number of stops don't go down, there is a smaller waiting time."

Notes:
See also: Link to article in the Tyler Paper (last accessed 25 Feb 2008)
http://www.tylerpaper.com/article/20071209/NEWS08/712080377


System Cost Comments

No comments posted to date

Comment on this System Cost

To comment on this summary, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

Correspondence with Mr. Kirk Houser, PE, Traffic Engineer, City of Tyler, Texas

Author: ADRIENNE GRAHAM

Source Date: 12/09/2007

URL: http://www.tylerpaper.com/article/20071209/NEWS08/712080377

System Cost

See summary information

Rating

Average User Rating

0 ( ratings)

Rate this System Cost

(click stars to rate)


Cost ID: 2008-00179