Unit Cost Entry
Unit Cost Element - Sign Post
Unit Cost Component - Smart Transit Sign engineered post with installed foundation
San Luis Obispo, California, United States
Description
Permanent post mount for Smart Transit Sign (DMS)
Cost Type
EstimatedData Date
2008Reported Units
7Units
Each (EA)Year (Dollars)
2007Capital Cost per Unit ($)
$2,350.00O & M Cost per Unit ($)
Lifetime
yearsNotes
This sign post would be engineered to properly fit and secure the Smart Transit Signs and have a concrete base.Related Unit Cost Subsystems
Keywords
None defined
ID: 2012-02216