Unit Cost Entry

Unit Cost Element - Planning

Unit Cost Component - High-Occupancy Toll Lane (HOT lane)


Minneapolis, Minnesota, United States


Description

Cost estimate to convert a freeway shoulder lane into a MnPASS Lane on Corridor 1A. TH 36: I-35W to I-35E.

Cost Type

Estimated

Data Date

2010

Reported Units

5 miles

Units

Per Mile

Year (Dollars)

2010

Capital Cost per Unit ($)

$9,500,000.00

O & M Cost per Unit ($)

$50,000.00

Lifetime

20 years


Notes

Total capital cost: $7 million to $12 million per mile (includes ATM and non-ITS infrastructure).
ATM component: $6 million per corridor (includes tolling equipment, signs, sign structures, and communications infrastructure).

Source

MnPASS System Study Phase 2: Final Report

Published By: Minnesota DOT

Prepared by Cambridge Systematics for the MnDOT

URL: http://www.mnpass.org/pdf
s/MnPassSystemStudy2.pdf
Related System Cost ID: 2012-00244

Unit Cost Details

Capital Cost per Unit: $9,500,000.00

O&M Cost per Unit: $50,000.00

Year (Dollars): 2010

Lifetime: 20 years


Related Unit Cost Subsystems

Other System Wide

Keywords

congestion pricing, value pricing, variable road pricing, managed lanes

ID: 2012-01913