Unit Cost Entry

Unit Cost Element - Labor for HOT lane Management

Unit Cost Component - Labor for HOT lanes management


San Francisco, California, United States


Description

Labor for HOT lanes management

Cost Type

Estimated

Data Date

2008

Reported Units



Units

Per Year

Year (Dollars)

2008

Capital Cost per Unit ($)



O & M Cost per Unit ($)

$540,000.00

Lifetime

years


Notes

Labor Costs assume: Operators (2 @ 50% of the time, at $100,000). Maintenance Technicians (2 @ $75,000). Transportation Engineer (1 @ 50% of the time, at $100,000). Salary costs are fully loaded prices including base salary, overtime, overhead, benefits, etc.

Source

Integrated Corridor Management: Analysis, Modeling, and Simulation Results for the Test Corridor

Author: Alexiadis, V.

Published By: U.S. Department of Transportation

Prepared by Cambridge Systematics for the U.S. DOT

URL: https://rosap.ntl.bts.gov
/view/dot/3995
Related System Cost ID: 2009-00194

Unit Cost Details

Capital Cost per Unit:

O&M Cost per Unit: $540,000.00

Year (Dollars): 2008

Lifetime: years