Unit Cost Entry
Unit Cost Element - Lane Control Sign (Installed)
Unit Cost Component - Automated Work Zone Information System
San Diego, California, USA
Description
Automated Work Zone Information System (AWIS) acquires traffic data throughout the work zone and display predetermined information to motorists automatically without operator intervention after system initialization. Lump Sum price includes furnishing, installing, operating, and maintaining the AWIS during interchange modification and overcrossing widening project with duration of 750 work days.
Cost Type
Bid TabulationData Date
2016Reported Units
1Units
Lump Sum (LS)Year (Dollars)
2016Capital Cost per Unit ($)
$40,000.00O & M Cost per Unit ($)
Lifetime
yearsNotes
Bidder 3Related Unit Cost Subsystems
Keywords
None defined
ID: 2017-05257