Unit Cost Entry

Unit Cost Element - Infrastructure

Unit Cost Component - TRENCHING AND BACKFILLING


Kentucky, USA


Description

Trench and backfill for connection.

Cost Type

Actual

Data Date

2007

Reported Units

10935

Units

Linear Foot (LF)

Year (Dollars)

2007

Capital Cost per Unit ($)

$3.00

O & M Cost per Unit ($)



Lifetime

years


Notes

Louisville-Nashville Road I-65 (Kentucky) Bid Tab Data (No.2)

Source

KYTC Highway District 3 ITS: Letting of 8-24-2007

Author: Kentucky Transportation Cabinet

URL: http://transportation.ky.
gov/Contract/Lettings/200
7/0824/ http://transporta
tion.ky.gov/Contract/Lett
ings/2007/0824/Notice%20t
o%20Contractors%20-%20Part%201.pdf http://transportation.ky.gov/Contract/Lettings/2007/0824/Unit%20Bid%20Tabulations.pdf

Unit Cost Details

Capital Cost per Unit: $3.00

O&M Cost per Unit:

Year (Dollars): 2007

Lifetime: years


Related Unit Cost Subsystems

Non-ITS

Keywords

None defined

ID: 2010-01510