Unit Cost Entry
Unit Cost Element - Integration for Traffic Surveillance
Unit Cost Component - System Integration (CMS/CCTV/TMC)
Anaheim, California, USA
Description
System integration activities required to connect CMS and CCTV with a TOC. Project duration was 140 working days.
Cost Type
Bid TabulationData Date
2016Reported Units
1Units
Lump Sum (LS)Year (Dollars)
2016Capital Cost per Unit ($)
$52,000.00O & M Cost per Unit ($)
Lifetime
yearsNotes
This bid tab data was proposed for a project designed to connect and integrate changeable message signs (CMS) and closed circuit television cameras (CCTV) with a Traffic Operations Center (TOC) to manage traveler information and traffic surveillance on the Route 91 Express Lanes between Orange, Anaheim, and Corona, California. (Bidder 3)Related Unit Cost Subsystems