Cost Subsystem
Equipment
Roadside Signal Preemption/Priority
UNID
55C8D6F87B7221BC85256F1F00618ECB
Lifetime
10
Sort Number
0
Unadjusted Low Capital Cost
5.00
Unadjusted High Capital Cost
6.00
Unadjusted Capital Cost Date
Unadjusted High O&M Cost
1.00
Unadjusted Low O&M Cost
0.20
Unadjusted O&M Cost Date
Adjusted Low Capital Cost
3.72
Adjusted High Capital Cost
4.46
Adjusted Capital Cost Date
Adjusted Low O&M Cost
0.15
Adjusted High O&M Cost
0.37
Adjusted O&M Cost Date
Sort
33.10
Unadjusted Notes

Includes infrared detector, detector cable, phase selector, system software, and installation. Capital costs range is for two-directions. O&M cost estimate for operating, monitoring, and maintaining. Complement to transit (or emergency vehicle) on-board Signal Preemption/Priority Emitter. Capital costs can rise to $20K to $30K per intersection if traffic control equipment and/or systems need to be replaced.

Adjusted Notes

Includes infrared detector, detector cable, phase selector, system software, and installation. Capital costs range is for two-directions. O&M cost estimate for operating, monitoring, and maintaining. Complement to transit (or emergency vehicle) on-board Signal Preemption/Priority Emitter. Capital costs can rise to $20K to $30K per intersection if traffic control equipment and/or systems need to be replaced.

Sample Unit Cost