Equipment
Dynamic Message Sign Tower
UNID
6EBFC7BE8D6F899C85256F1F00618F2C
IDAS Number
RS016
Lifetime
20
Sort Number
0
Unadjusted Low Capital Cost
25.00
Unadjusted High Capital Cost
251.45
Unadjusted Capital Cost Date
Adjusted Low Capital Cost
31.58
Adjusted High Capital Cost
251.45
Adjusted Capital Cost Date
Sort
41.00
Unadjusted Notes

Low capital cost is for a small structure for arterials. High capital cost is for a larger structure spanning three to four lanes. DMS tower structure requires minimal maintenance.

Adjusted Notes

Low capital cost is for a small structure for arterials. High capital cost is for a larger structure spanning three to four lanes. DMS tower structure requires minimal maintenance.

Sample Unit Cost