Cost Subsystem
Equipment
High-Speed Camera
UNID
EDE08957A772959C85256F1F00618F3B
IDAS Number
TP002
Lifetime
10
Sort Number
0
Unadjusted Low Capital Cost
7.00
Unadjusted High Capital Cost
10.00
Unadjusted Capital Cost Date
Unadjusted High O&M Cost
1.00
Unadjusted Low O&M Cost
0.50
Unadjusted O&M Cost Date
Adjusted Low Capital Cost
4.99
Adjusted High Capital Cost
7.13
Adjusted Capital Cost Date
Adjusted Low O&M Cost
0.28
Adjusted High O&M Cost
0.57
Adjusted O&M Cost Date
Sort
51.00
Unadjusted Notes

Cost includes one camera per two lanes.

Adjusted Notes

Cost includes one camera per two lanes.

Sample Unit Cost