Equipment
Labor for Freeway Control
UNID
F204DB5C0D97940F85256F1F00618F0B
IDAS Number
TM005
Sort Number
0
Unadjusted High O&M Cost
275.00
Unadjusted Low O&M Cost
225.00
Unadjusted O&M Cost Date
Adjusted Low O&M Cost
369.54
Adjusted High O&M Cost
451.67
Adjusted O&M Cost Date
Sort
111.00
Unadjusted Notes

Labor for operations (two @ 50% of $100K) and maintenance technicians (two @ $75K). Salary cost are fully loaded prices including base salary, overtime, overhead, benefits, etc.

Adjusted Notes

Labor for operations. Two staff (at 0.5 FTE each) and two maintenance technicians. Salary cost are fully loaded prices including base salary, overtime, overhead, benefits, etc.

Sample Unit Cost