City Collinsville State Illinois Country United States Geo Type Region Latitude 38.67 Longitude -89.98
Life cycle cost of four options for a communications network connecting ITS field devices to the Illinois DOT District 8 Traffic Operations Center range from $43 million to $52.5 million. The Illinois Department of Transportation (IDOT) District 8 will be deploying ITS field devices in conjunction with several multi-million dollar construction projects. This report highlights theā¦ Content type System Cost Made Public Date 03/05/2004 Taxonomy (ARC-IT) Traffic Information Dissemination (TM06), Integrated Decision Support and Demand Management (TM09), Broadcast Traveler Information (TI01), Infrastructure-Based Traffic Surveillance (TM01), Regional Traffic Management (TM07) Geolocation links Collinsville, Illinois, United States