Content that references this location

Operating costs for Tennessee DOT’s HELP program were $6.5 million for FY 2005-06.

Content references source material no longer available at its original location.
The Tennessee DOT (TDOT) HELP program began in July 1999 for the purpose of reducing traffic congestion, improving safety, and assisting motorists in distress. HELP is a component of TDOT's…
Content type
Made Public Date
01/31/2007
Taxonomy (ARC-IT) Roadway Service Patrols (PS08)

Operating costs for Tennessee DOT’s HELP program were $5.6 million for FY 2004-05.

The Tennessee DOT (TDOT) HELP program began in 1999 for the purpose of reducing traffic congestion, improving safety, and assisting motorists in distress. HELP is a component of TDOT's intelligent…
Content type
Made Public Date
04/06/2006
Taxonomy (ARC-IT) Roadway Service Patrols (PS08)

Estimated benefits for shippers using an integrated shipment, equipment, and freight status information system equate to a 6.2 percent reduction in shipment costs.

Benefits from an internet-based information system for tracking cargo from point-to-point were realized by increasing the efficiency of modal shifts from rail to truck, reducing errors in data entry…
Content type
Date Posted
06/14/2010